Back To Home
Optimised Electrotech
share
Optimised Electrotech
share
Design for manufacturing
Role
25 day turn around time for a working prototype | Form & Aesthetics | Design for manufacturing | Prototype development | Low volume cost effective production assistance for uncompromised quality
Client
Optimised Electrotech
Project Year
2020-21
Role
25 day turn around time for a working prototype | Form & Aesthetics | Design for manufacturing | Prototype development | Low volume cost effective production assistance for uncompromised quality
Client
Optimised Electrotech
Year
2020-21
The camera was developed during the the initial stage of covid, when body temperatures was a criteria for screening for covid positive symptoms. We worked along with the tech team at Optimised to create a product that for quality and IP compliances. As they developed the internal components and its working, we worked on the enclosure, understanding its use, need for maintenance and component assembly requirements.
Our scope of work included designing the enclosure and developing a beta batch of 30-40
products for it's immediate usage at certain stations for the Indian Railways for mass
thermal screening. The low volume batch production was compliant of the needed IP
standards and structural
strength similar to injection molding.
Material : ABS, IP 67 compliant, Vacuum
casting for batch production.